{"id":52676,"date":"2026-04-14T12:22:02","date_gmt":"2026-04-14T15:22:02","guid":{"rendered":"https:\/\/tardeperoseguro.com.ar\/?p=52676"},"modified":"2026-04-14T12:22:02","modified_gmt":"2026-04-14T15:22:02","slug":"anpyn-exige-la-devolucion-de-fondos-para-obras-que-no-se-hicieron-en-el-puerto-de-ushuaia","status":"publish","type":"post","link":"https:\/\/tardeperoseguro.com.ar\/?p=52676","title":{"rendered":"ANPYN exige la devoluci\u00f3n de fondos para obras que no se hicieron en el Puerto de Ushuaia"},"content":{"rendered":"<p>La\u00a0<a href=\"https:\/\/dinamicarg.com\/gobierno-interviene-puerto-ushuaia-las-razones-se-organiza-operatoria\/\">intervenci\u00f3n del Puerto de Ushuaia\u00a0<\/a>sum\u00f3 un\u00a0<strong>cap\u00edtulo adicional de tensi\u00f3n\u00a0<\/strong>en\u00a0<a href=\"https:\/\/dinamicarg.com\/intervencion-puerto-ushuaia-corte-suprema\/\">Tierra del Fuego,\u00a0<\/a>con el reclamo administrativo de la ANPYN a la Direcci\u00f3n Provincial de Puertos por una\u00a0<strong>deuda de m\u00e1s de 500 millones de pesos.<\/strong><\/p>\n<p>El reclamo, similar al que la Agencia\u00a0<strong>tambi\u00e9n plante\u00f3 al puerto de Dock Sud<\/strong>, tiene su origen en un pr\u00e9stamo que el por entonces Ministerio de Transporte realiz\u00f3 a la DPP de Tierra del Fuego por\u00a0<strong>200 millones de pesos.<\/strong><\/p>\n<div class=\"wp-block-data443-irp-shortcode irp-shortcode\">\n<div>\n<div><span class=\"ctaText\">Te puede interesar<\/span>\u00a0<span class=\"postTitle\">Nace EPECH, una empresa estatal energ\u00e9tica de Chubut con foco en las renovables y el hidr\u00f3geno<\/span><\/div>\n<\/div>\n<\/div>\n<p>En el convenio, firmado definitivamente en noviembre de 2021, el ministerio \u2013a trav\u00e9s de la\u00a0<strong>Subsecretar\u00eda de Puertos<\/strong>, V\u00edas Navegables y Marina Mercante-\u00a0<strong>aport\u00f3 los fondos<\/strong>\u00a0al organismo portuario fueguino.<\/p>\n<p>All\u00ed se establec\u00eda que el dinero se destinar\u00eda\u00a0<strong>exclusivamente<\/strong>\u00a0a las obras de \u201c<strong>construcci\u00f3n de la Terminal de Cruceros<\/strong>\u00a0y muelle tur\u00edstico\u00a0<strong>para embarcaciones menores<\/strong>\u00a0que realizan excursiones mar\u00edtimas en el canal de Beagle \u2013Puerto Ushuaia\u201d, con un\u00a0<strong>plazo de 36 meses.<\/strong><\/p>\n<p>Las cl\u00e1usulas del convenio establecen c\u00f3mo ser\u00eda\u00a0<strong>la devoluci\u00f3n de los fondos<\/strong>: la DPP deb\u00eda realizar\u00a0<strong>una rendici\u00f3n de cuentas<\/strong>\u00a0(a los 180 d\u00edas de finalizado el convenio) y devolver el dinero que sobrara, si es que eso sucediera. En caso de no cumplir \u2013con las obras o con la rendici\u00f3n- al monto a devolver se le aplicar\u00eda una tasa de inter\u00e9s del Banco Naci\u00f3n y\u00a0<strong>una penalidad mensual del 10%<\/strong>\u00a0del total.<\/p>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>No hubo rendici\u00f3n de cuentas por parte de la DPP, por lo que se exige la totalidad del monto girado (200 millones de pesos) m\u00e1s los intereses, por una suma que asciende en total a 547.842.000 pesos.<\/p><\/blockquote>\n<p>En la nota enviada a la DPP para reclamar los fondos, ANPYN resalta que la Agencia es la continuadora jur\u00eddica de la Subsecretar\u00eda de Puertos y V\u00edas Navegables. Como tal, destaca que\u00a0<strong>no hubo rendici\u00f3n de cuentas\u00a0<\/strong>por parte de la DPP, por lo que se exige la totalidad del monto girado (200 millones de pesos)\u00a0<strong>m\u00e1s los intereses<\/strong>, por una suma que asciende en total a 547.842.000 pesos.<\/p>\n<p>La intimaci\u00f3n \u2013pagar la deuda\u00a0<strong>en cinco d\u00edas h\u00e1biles<\/strong>\u2013 destaca que dichos intereses no est\u00e1n contemplando la\u00a0<strong>penalidad del 10% mensual<\/strong>\u00a0establecida en el convenio de\u00a0<strong>asistencia t\u00e9cnica y financiera,<\/strong>\u00a0y que la misma ser\u00e1 a\u00f1adida en caso de falta de respuestas por parte de la DPP.<\/p>\n<p>El plazo que se estableci\u00f3 en la nota venci\u00f3 d\u00edas atr\u00e1s, sin que la DPP haya presentado ning\u00fan tipo de respuesta,\u00a0<strong>ni siquiera rechazando el reclamo<\/strong>, por lo que se descarta que el conflicto avance al plano judicial.<\/p>\n<p>Cabe recordar que ANPYN intervino en enero el Puerto de Ushuaia, tras\u00a0<strong>detectar desv\u00edo de fondos<\/strong>\u00a0y un serio riesgo de seguridad operativa por falta de obras esenciales.<\/p>\n<h2 class=\"wp-block-heading\">Dock Sud, un reclamo similar<\/h2>\n<p>La nota administrativa enviada por la ANPYN a la Direcci\u00f3n Provincial de Puertos de Tierra del Fuego tiene<strong>\u00a0caracter\u00edsticas similares<\/strong>\u00a0a la exigencia planteada al\u00a0<a href=\"https:\/\/dinamicarg.com\/denuncian-al-puerto-dock-sud\/\">Consorcio de Gesti\u00f3n del Puerto Dock Sud,<\/a>\u00a0formalizada en febrero.<\/p>\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-41683 lazyload\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-src=\"https:\/\/dinamicarg.com\/wp-content\/uploads\/2025\/12\/dock-sud-nueva-2-1-1024x576.jpg\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" data-sizes=\"auto\" data-srcset=\"https:\/\/dinamicarg.com\/wp-content\/uploads\/2025\/12\/dock-sud-nueva-2-1-1024x576.jpg 1024w, https:\/\/dinamicarg.com\/wp-content\/uploads\/2025\/12\/dock-sud-nueva-2-1-300x169.jpg 300w, https:\/\/dinamicarg.com\/wp-content\/uploads\/2025\/12\/dock-sud-nueva-2-1-768x432.jpg 768w, https:\/\/dinamicarg.com\/wp-content\/uploads\/2025\/12\/dock-sud-nueva-2-1.jpg 1200w\" alt=\"Dock Sud, puerto,\" width=\"1024\" height=\"576\" \/><figcaption class=\"wp-element-caption\">ANPYN reclam\u00f3 tambi\u00e9n a Dock Sud por una deuda, en este caso de dragado de canales de acceso.<\/figcaption><\/figure>\n<p>En ese caso, el reclamo\u00a0<strong>ya lleg\u00f3 a nivel judicial<\/strong>, tras el intercambio de notas entre la ANPYN y las autoridades del Puerto de Dock Sud, en las que\u00a0<strong>reconocieron la existencia de una deuda<\/strong>\u00a0y su voluntad de acordar un plan de pagos.<\/p>\n<div class=\"wp-block-data443-irp-shortcode irp-shortcode\">\n<div>\n<div><span class=\"ctaText\">Te puede interesar<\/span>\u00a0<span class=\"postTitle\">Usuarios de la Hidrov\u00eda destacaron el avance de la licitaci\u00f3n<\/span><\/div>\n<\/div>\n<\/div>\n<p>Ante la\u00a0<strong>falta de avances\u00a0<\/strong>en una negociaci\u00f3n sobre c\u00f3mo se har\u00eda dicho pago, ANPYN fue a la justicia para exigir el pago de la deuda.<\/p>\n<p>Desde la Agencia se reclam\u00f3 a Dock Sud por la deuda que mantiene con la Administraci\u00f3n General de Puertos por el\u00a0<strong>dragado de los canales de acceso<\/strong>, que ambos puertos comparten.<\/p>\n<div class=\"tags\">Fuente: dinamicarg.com<\/div>\n","protected":false},"excerpt":{"rendered":"<p>La\u00a0intervenci\u00f3n del Puerto de Ushuaia\u00a0sum\u00f3 un\u00a0cap\u00edtulo adicional de tensi\u00f3n\u00a0en\u00a0Tierra del Fuego,\u00a0con el reclamo administrativo de la ANPYN a la Direcci\u00f3n Provincial de Puertos por una\u00a0deuda de m\u00e1s de 500 millones de pesos. El reclamo, similar al que la Agencia\u00a0tambi\u00e9n plante\u00f3 al puerto de Dock Sud, tiene su origen en un pr\u00e9stamo que el por entonces [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":52677,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[17,1],"tags":[],"class_list":["post-52676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-informacion-general","category-provinciales"],"_links":{"self":[{"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=\/wp\/v2\/posts\/52676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=52676"}],"version-history":[{"count":1,"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=\/wp\/v2\/posts\/52676\/revisions"}],"predecessor-version":[{"id":52678,"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=\/wp\/v2\/posts\/52676\/revisions\/52678"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=\/wp\/v2\/media\/52677"}],"wp:attachment":[{"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=52676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=52676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tardeperoseguro.com.ar\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=52676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}